Warehousing•Dankuni Industrial Corridor, Hooghly•Completed 2023

Logistics Hub & PEB Warehouse

ROLE: Lead Structural & Geotechnical Consultant

PROJECT SCALE
85,000 Sq. Ft.
Clear Span
36 Meters
Steel Optimization
14% Saved
Borehole Depth
24 Meters
01. Technical Challenge

Site & Structural Constraints

High water table and soft alluvial clay strata required specialized soil stabilization and high-bearing isolated footings to resist heavy crane wheel loads and wind uplift on a 36m clear-span PEB frame.

02. Methodology & Calculations

Engineering Approach

Conducted 6 deep SPT boreholes up to 24m depth. Engineered a hybrid foundation scheme combining compacted stone columns with rigid RCC pedestals. Structural steel members were optimized using finite element modeling under IS 800:2007.

03. Validated Results

Structural & Operational Outcome

Achieved a 14% reduction in structural steel tonnage while exceeding IS 1893 seismic ductility standards. Zero settlement observed during full operational loading.

Disciplines Deployed

  • Geotechnical Soil Testing
  • Structural Steel Design
  • Municipal Sanction Drawings
  • Waterproofing