THE ARCHSTRUCT CONSULTANT
THE ARCHSTRUCT CONSULTANT
Infrastructure•Hooghly - Bardhaman Highway Link•Completed 2022

Regional Drainage Culvert & Bridge Approach

ROLE: Geomatic & Structural Design Consultant

PROJECT SCALE
Linear Infrastructure
Catchment Survey
3.0 Kilometers
Culvert Type
Multi-Cell Box
Design Code
IRC:112
01. Technical Challenge

Site & Structural Constraints

Flash flood catchment area with highly erodible alluvial banks requiring rapid hydraulic discharge and scour-resistant foundation design.

02. Methodology & Calculations

Engineering Approach

Conducted electronic Total Station terrain modeling over a 3km catchment corridor. Designed a multi-cell RCC box culvert under IRC:112 concrete bridge codes with deep cut-off walls.

03. Validated Results

Structural & Operational Outcome

Successfully weathered consecutive monsoon seasons with zero scour undermining or waterlogging on the state arterial corridor.

Disciplines Deployed

  • Topographical Surveying
  • Soil Investigation
  • Structural Culvert Design

Planning a Similar Project?

Consult with our engineering team regarding site analysis, foundation schemes, or structural modeling.

Consult on this Typology